No. This is not a vehicle-to-grid (V2G) or vehicle-to-home (V2H) installation. This is a V1G, or smart charging, installation that can control the charge rate and time. These stations can potentially be V2G enabled in the future, if there is a compatible vehicle and an approved utility interconnection. This charging station is V2G capable with approved vehicles and interconnection, but not in scope for this offer.
Recent Posts